Timelapse Showreel - Griffith Bridge assembly (Smith street)
filed under medium-term, turbo, construction
downloadable version
mp4, 480x320, 4min 46sec, 35mb
This is a small preview
The full HD 1080p timelapse video has 10x the detail of this web preview
This timelapse sequence shows the construction of a suspension bridge over a Smith street (Southport, QLD) a 4-lane arterial. The sequence is comprised of excerpts from a longer sequence which covers the entire 7 day project. Throughout the sequence you can see several cranes working co-operatively to place elements of the suspension bridge in place.
More timelapse sequences
-
SWRPA water reservoir construction (438 days)
15 months in 00:44 -
Brisbane Gateway Bridge upgrade project (mornings)
2.5 years in 00:30 -
Brisbane Northern Busway Camera-1 (days)
15 months in 00:51 -
Brisbane Northern Busway Camera-2 (days)
12 months in 00:30 -
Lady Elliot Island Western Beach Lighthouse
7 days in 01:49 -
Australian Dust-storm 2009 (RBWH)
48 hours in 00:20 -
Lady Elliot Island South-Eastern beach
7 days in 02:07 -
Brisbane Gateway Bridge upgrade project (August 2009)
30 days in 04:10 -
Traveston Highway upgrade project (excerpt)
6 days in 01:14 -
Australian Dust-storm 2009 (gateway bridge)
48 hours in 00:21 -
Brisbane Northern Busway concrete-pour
18 hours in 01:46 -
SWRPA water reservoir concrete-pour (Ormeau)
11 hours in 02:15 -
Keri-lee super-yacht launch at Rivergate marina
1 hour in 00:23 -
Caboolture River Bridge span lift
5 hours in 01:30